How we do it

Technology is still about people.

A project isn't finished when the system goes live. It's finished when people would rather use it than go back. Everything in our approach is built around that.

Project management: discipline on both sides

Every successful project rests on strong leadership from both the vendor and the agency, and a shared commitment to the same project discipline. It's tempting to skip the groundwork and start building. We don't, because that groundwork has little to do with technology and everything to do with success.

  • Set up how we'll work before we build. Early on, we agree with the agency how the team will communicate, decide and report, and refine it together. That time pays off later.
  • Keep the project visible. Open, regular communication and shared plans, built with the agency's input, keep everyone working from the same picture.
  • Find risks early. We look for threats to the schedule, budget and quality before they arrive. That takes critical thinking, and a healthy dose of skepticism.
  • Value the planning over the plan. Any plan goes out of date. The habit of planning together is what keeps a project on track.

Change management: earn the buzz

New systems create stress for the people who have to learn them. We plan for that from day one, with the agency's leadership.

  • Get a quick win first. We scope the first phase so something real ships early. Users who see a benefit tell their colleagues, and that word of mouth does more than any memo.
  • Build a steering group. Representatives from each affected department meet regularly, raise concerns early, and carry the news back to their teams.
  • Keep it on every agenda. The project stays visible in department meetings, with a standing chance for staff to weigh in.
  • Keep the experience smooth. How the implementation feels shapes what people say at the watercooler. Issues will come up; how quickly they are fixed is what users remember.
  • Keep leadership visible. People commit to a change when they see the organization is committed to it.

Michigan's Records Management Services, which sponsors the statewide e-signature service, is a good example. Its own team gives each new business unit an interactive demonstration, local help-desk coordinators provide first-line support, and tip sheets and recorded videos are always on hand. Most basic use cases take less than 30 minutes of training.

Delivery: agile, with a paper trail

We work iteratively, so the people who'll use the system see it take shape and can change their minds while change is still cheap. Each stage still ends with documented deliverables and the agency's sign-off.

  1. Stage 1

    Plan

    Project charter, communication plan, risk plan and schedule, and a kickoff with a working prototype so people see the goal on day one.

  2. Stage 2

    Requirements

    Discovery workshops, worksheets and surveys staff can complete on their own time. Output: requirements specification, flow diagrams and a traceability matrix.

  3. Stage 3

    Design

    A design presentation to the subject-matter experts before anything is built, plus the first test plan and test cases.

  4. Stage 4

    Build

    Iterative configuration and development, reviewed with the agency's team as it happens.

  5. Stage 5

    Test

    Our User Acceptance Test guide doubles as training, so testers can run their scripts before formal training begins. Agencies can run UAT without us in the room if their testers will speak more freely.

  6. Stage 6

    Train

    Role-based training for every group that touches the system, from front-line staff to administrators.

  7. Stage 7

    Transition

    Readiness reviews with each department: documentation, open items, support procedures, and how future changes move to production.

  8. Stage 8

    Go live

    Knowledge transfer, a lessons-learned session and a certificate of completion after a 90-day post-launch period.

Requirements that surface late. Users often discover what they really need once they see the design. On rapid-development platforms we can usually absorb those changes without adding time or cost, and we use a formal change request when we can't.

After go-live: we keep checking in

People often don't report small problems. They live with them until they become big ones. So after launch we hold a regular pulse check with the people using the system, review the support log together, and sort each issue into a defect, a training need or a new feature.

We handle first-line support ourselves because we know the system best.